How to build a construction progress management system? A renovation firm with 15 sites and photos buried in LINE groups: daily-report app, photo archive and client progress page for NT$200,000–550,000

2026.10.25 · 105 views
How to build a construction progress management system? A renovation firm with 15 sites and photos buried in LINE groups: daily-report app, photo archive and client progress page for NT$200,000–550,000
“

A construction progress management system plan for interior renovation, MEP and small contractors: when it fits and when it doesn't, Excel vs off-the-shelf construction software vs custom build, a 5-phase process with tools, real costs including photo storage and notifications, 5 common traps, a 90-day roadmap and a decision checklist. ”

Share:

Short answer: A construction progress management system comes down to "crews file a daily report in one minute, clients check progress themselves." For renovation or MEP firms running 10+ sites at once, a custom system costs about NT$200,000–550,000, launches in 12–16 weeks, and typically cuts site managers' 2 hours a day of progress replies to under 30 minutes.

The pain: photos from 15 sites buried in LINE groups

A 25-person renovation firm runs 15 sites at once, each with its own LINE group receiving 30–50 photos a day. When a client asks "Has the bathroom waterproofing been done?", the site manager scrolls back three days to find the photo; at month-end billing, change orders rely on memory. Three site managers each spend 2 hours a day answering, over 1,500 hours a year.

When it fits and when it doesn't: site count and client contact decide

Firms with more than 10 sites and clients who ask often benefit most.

Good fitPoor fit
Renovation, MEP or small contractors with 10+ concurrent sites3 or fewer sites the owner can watch personally
Homeowner clients who often ask for progress and photosOnly large tenders where the client runs its own PM system
Change orders often cause billing disputesEvery job differs so much no task template is possible
You want duration data to improve quotesCrews don't use smartphones at all

Alternatives matrix: off-the-shelf for few sites, custom when quotes and client pages must connect

No option is best in absolute terms; it depends on site count and integration needs.

OptionProsConsCost range
Excel + LINE groupsFree, everyone knows itPhotos get lost, no progress roll-upNT$0
Construction management SaaSFast to launch, full-featuredHard to connect accounting and your own quotesAbout NT$300–1,200 per user per month
Custom systemFits your task list, supports a client progress pageHigher upfront cost, 12–16 weeksNT$200,000–550,000

The full process: 5 phases, 12–16 weeks

The key is getting task templates right in phase 1 so later phases don't keep changing.

  • Discovery (2 weeks): interview site managers and crews, define task templates and daily-report fields, deliver a requirements list (Notion).
  • Flow and screen design (2–3 weeks): wireframe the app and back office in Figma and confirm the three-step report: pick site, take photos, tick tasks.
  • Development (6–8 weeks): Laravel back office plus Flutter app, cloud photo storage with auto-compression, daily client updates via the LINE Messaging API.
  • Pilot (2 weeks): run 2–3 sites and adjust fields and notification timing.
  • Full launch (1 week): import all sites, train staff, stop reporting through old groups.

Real costs: beyond the build, reserve about 15% a year in running costs

Maintenance is the main hidden cost; photo storage is surprisingly cheap.

  • Build: daily reports plus photo archive about NT$200,000–300,000; adding a client page, change orders and crew scheduling about NT$400,000–550,000.
  • Photo storage: about 100,000 photos (30GB) a year; at AWS S3 public pricing of about $0.023 per GB-month, under NT$100 a month.
  • LINE notifications: a LINE Official Account plan beyond the free quota runs about NT$800–1,200 a month.
  • App stores: Apple $99 a year, Google Play $25 once.
  • Maintenance: hosting, updates and small changes, about 10–15% of the build cost per year.

Reality vs expectation: the hardest part is crew habits, not software

Success in the first 3 months depends on management rules, not feature count.

  • Expect people to use it at launch → in reality the owner must rule "no daily report, no logged work" for at least a month.
  • Expect clients to find updates annoying → one daily update halves follow-up calls.
  • Expect templates to be final → they change 2–3 times in the first 3 months.

Common traps and how to avoid them: the 5 most common

Most traps come from asking crews to do one more step.

  • Too many report fields: keep only site, photos and completed tasks as required.
  • Uncompressed photos: originals are 4–5MB each; compress in the app before upload.
  • Clients seeing internal notes: separate permissions and show only approved photos.
  • Unsigned change orders: require client confirmation in the system with a timestamp.
  • Old groups left open: stop group reporting from week 2 after launch.

Success metrics and a 90-day roadmap: watch report submission rate first

If submissions are below 80%, no other metric matters.

  • Day 30: 80% daily-report submission; progress reply time halved.
  • Day 60: client progress page open for all sites; follow-up calls down 50%.
  • Day 90: review quotes with accumulated task-duration data; change-order disputes below one a month.

Decision checklist: 6 or more ticks means it's worth evaluating

The more you tick, the faster a custom system pays back.

  • ☐ More than 10 concurrent sites
  • ☐ Site managers spend over an hour a day answering progress questions
  • ☐ Finding one site photo often takes over 5 minutes
  • ☐ Change-order billing disputes in the past year
  • ☐ Most crew members can take photos on a smartphone
  • ☐ You want past duration data to improve quotes
  • ☐ One manager can drive adoption for 3 months
  • ☐ Budget of NT$200,000 or more is acceptable
  • ☐ Clients often ask to see photos
  • ☐ Task names can be standardized

FAQ

How much does a construction progress system cost?

About NT$200,000–550,000 depending on scope. Daily reports and photo archiving alone run NT$200,000–300,000; adding a client page, change orders and crew scheduling brings it to NT$400,000–550,000.

What if crews won't use an app?

Make the daily report three steps: pick the site, take photos, tick finished items, all within a minute. Pilot with 2 senior crew leads before launch and adjust to their feedback.

Will photo storage get expensive?

Usually not. Photos are compressed to about 300KB on upload; 15 sites produce roughly 100,000 photos (about 30GB) a year, and cloud storage typically costs under NT$100 a month.

Can we start with off-the-shelf construction software?

Yes. Firms with fewer than 5 sites and standard workflows save most with off-the-shelf tools. Consider custom work once you need accounting, quoting or a client page connected.

Next step: bring one site's LINE group and we'll estimate

ScriptWalker (a Taiwan Laravel/Flutter custom development studio) plans and builds construction progress management systems, with systems from NT$80,000 and app versions from NT$150,000; full builds usually land at NT$200,000–550,000. Export one site's group history and we'll assess for free which workflows to digitize first: